Mostrando entradas con la etiqueta closures. Mostrar todas las entradas
Mostrando entradas con la etiqueta closures. Mostrar todas las entradas

As reported by Airplan, the operator of the José María Córdova international airport in Rionegro (Antioquia), this weekend the runway will be closed for maintenance workauthorized by the Civil Aeronautics.

The closing time was the same as last weekend and it is as follows: from 2 am on Saturday, February 26, to 2 pm on Sunday, February 27, adding up to a total of 72 hours of work intervening on the pavement, counting the two work weekends.

The decision of said intervention, explained the entity, was made after seeing the results of the periodic measurements carried out by the Airport to identify the state of the runway.

(You may be interested in: La Solar Festival returns with ‘sold out’ in Medellín)

“These interventions are preventive and predictive measures, since for us it is a priority to guarantee the safety and quality of air operations. In fact, when running these jobs, we improve both the capacity and the rolling of the trackin turn strengthening the confidence that the airport community places in our terminal on a daily basis”, said Fredy Jaramillo Giraldo, manager of the Airport.

The manager added that the dates chosen for the closures were arranged with the different airlines that operate in the air terminal, “thus enabling timely notification to passengers and, consequently, the reorganization of flights.”

Although this event was known in advance, travelers were recommended to review their flight itineraries so that, in case of having a trip during closing hours, they can communicate with the respective airlines so that they can reschedule them, avoiding possible difficulties to time to travel.

MEDELLIN

As reported by Airplan, the operator of the José María Córdova international airport in Rionegro (Antioquia), this and next weekend the runway will be closed for maintenance workauthorized by the Civil Aeronautics.

The closing hours will be as follows: from 2 am on Saturday, February 19 to 2 pm on Sunday, February 20 and from 2 am on Saturday, February 26 to 2 pm on Sunday, February 27, adding a total of 72 hours of work to intervene. the pavement.

The decision of said intervention, explained the entity, was made after seeing the results of the periodic measurements carried out by the Airport to identify the state of the runway.

(You may be interested in: La Solar Festival returns with ‘sold out’ in Medellín)

“These interventions are preventive and predictive measures, since for us it is a priority to guarantee the safety and quality of air operations. In fact, when running these jobs, we improve both the capacity and the rolling of the trackin turn strengthening the confidence that the airport community places in our terminal on a daily basis”, said Fredy Jaramillo Giraldo, manager of the Airport.

The manager added that the dates chosen for the closures were arranged with the different airlines that operate in the air terminal, “thus enabling timely notification to passengers and, consequently, the reorganization of flights.”

Although this event was known in advance, travelers were recommended to review their flight itineraries so that, in case of having a trip during closing hours, they can communicate with the respective airlines so that they can reschedule them, avoiding possible difficulties to time to travel.

MEDELLIN

Through a statement on the page of the Mayor’s Office of Barranquilla, the Secretariat of Traffic and Road Safety announced that today, Wednesday February 9there will be closures on some city roads for repairs.

These works, which are given for works of construction of urban roadschange of tension lines and structures in type C poles, will be executed from 4:30 am to 6:00 pm

Thus, the roads that will be affected will be Carrera 49 C between Calles 99 and 102 and Calle 99 between Carreras 49 C and 46.

Pedestrians will be assisted by paleteros that will provide them with support in the location and traffic of the streets. In addition, there will also be paleteros and traffic assistants on the corners who will give way to the vehicles that pass through the area.

(Also read: ‘Jhonier seeks not to lose inheritance or go to prison with a psychiatric examination’)

road arrangements
Photo:

Government of the Atlantic Press

“The Secretariat of Traffic and Road Safety with the support of the Traffic Police and Mobility Advisors, will ensure road safety and will be vigilant to avoid congestion on these roads,” they assured in the statement.

It is important to remember that from YesterdayTuesday, February 8, works are being carried out on Carrera 12b between Calles 12b and Diagonal 5, on Carrera 22 between Calles 11 and 6, and on Calle 94 between Carreras 1e and 2 Sur.

These works will be carried out by the firm FSCR Ingeniería SAS, AIR-E’s contractor. Regarding the aspects technicians Of the projects, the Secretariat said: “Construction of the underground lines with technology without open trench, directed drilling for cable management of 110 KKVP, of the UPME STR-02 2019 project.”

More news

These are the areas where politicians fear going to campaign

Intolerance: ‘With a fist a man hurt my jaw for 500 pesos’

Why are potatoes so expensive? This they say from Corabastos

The Winter Olympics put Villa de Montaña as the hub of the event

top